HIGHWAYS AND BRIDGES

BRIDGES

TOLLWAY - SYSTEMWIDE, CONSTRUCTION MANAGEMENT SERVICES UPON REQUEST, ON CALL AS NEEDED No. RR-22-4862

Firm's Role: CM:

Construction management / inspections on bridges, on-call, as needed.

HIGHWAYS

TOLLWAY - FACILITIES, PHASE I & II ENGINEERING SERVICES ON TOLLWAY PLAZAS

The Tollway has identified several Tollway ramp plaza facilities throughout the Tollway system which are candidates for repair, potential relocation, and replacement. Phase I engineering services are required to perform a functionality assessment at each of these facilities and provide a recommended action plan at each location.

Firm's Role: Project Controls:

  • Verify existing plaza facility elements and conditions due to client not having accurate records of their plazas. This includes plaza utilities, electrical systems, lighting systems, utility poles, plaza equipment, signage. Verify existing conditions of lighting poles, signage poles and appurtenances.
  • Verifying and coordination of all existing utilities in each interchange, including gas, water lines, electrical, fuel, fiber optic, telephone lines.
  • Scheduling – develop construction schedules
  • Cost Estimate Reviews
  • Constructability review
  • QAQC oversight and documentation

TRAILS

COOK COUNTY ILLINOIS PROJECT: 3345 - NORTH BRANCH AND SALT CREEK PAVED TRAILS – TRAIL SAFETY IMPROVEMENTS 

Role of the Firm: CMPM:

  • Verify existing safety conditions of 30 miles at two Cook County bike trails. Check for underground utilities by calling in detailed locates for Verification of all existing utilities, including gas, water lines, electrical, fuel, fiber optic, telephone lines.
  • Verify existing conditions of lighting poles, signage poles and appurtenances.
  • Verified the locations of all stop gates and signages on NB and Salt Creek Paved Trails
  • Scheduling – developed schedules for stop gate removals and/or replacement, signage removals and / or replacements, paving crew schedules, and lastly paint crew scheduling / coordination for all of two trails
  • Managed paving crews on 26 locations, where stop gates were removed and / or replaces.
  • Made sure that old signage was removed, and new signages were installed at the entrance points of the trails at various locations, as per the plans.
  • Project Management Support – Scope of Services as follows:
    • Document control for project documents, drawings and information including receiving, logging and distributing project related documents, information clarification requests.
    • Organize and maintain up-to-date project drawing and specification files.
    • Assist with organizing, managing and reporting on project compliance related to trade labor hours, and Local Area Residency monitoring and reporting.
    • Furnishing of all drop gates
    • Assist with coordination of project scheduling documentation and reporting.