Featured Projects
PROJECT NAME: NICTD Double Track - One (DT-1) South Shore Line ($375M)
OWNER: NORTHERN INDIANA COMMUTER TRANSPORTATION DISTRICT
CLIENT: MEADE INDUSTRIES (GC: WALSH GROUP)
Firm Role: Project Management / Controls
- Lead installation of 188 drilled piers for new overhead catenary system.
- Coordinate placement of 500 tons of structural steel for new overhead catenary system.
- Oversee setup of 765 Wood Utility Poles for ensuring efficient deployment.
- Execute installation of 565 down guys and screw anchors with precision and meticulous planning.
- Conduct field measurements and validate elevations for enabling creation of as-built drawings vital for structural steel fabrication process.
- Direct installation of 40 new NIPSCO/NICTD Joint wood poles, along with associated appurtenances, 16000 feet of 336/477 ACSR Conductor, and 7500 feet of 1/0 static wire.
- Spearhead pre-activity meetings for all-inclusive construction process plans in collaboration with Construction Manager/General Contractor for project alignment.
- Engineer tracking sheet to monitor installation progress of all commodities within NICTD DT1 Project.