PROJECT NAME: NICTD Double Track - One (DT-1) South Shore Line
OWNER: NORTHERN INDIANA COMMUTER TRANSPORTATION DISTRICT

Lead installation of 188 drilled piers for new overhead catenary system. Coordinate placement of 500 tons of structural steel for new overhead catenary system. Oversee setup of 765 Wood Utility Poles for ensuring efficient deployment. Execute installation of 565 down guys and screw anchors with precision and meticulous planning. Conduct field measurements and validate elevations for enabling creation of as-built drawings vital for structural steel fabrication process. Direct installation of 40 new NIPSCO/NICTD Joint wood poles, along with associated appurtenances, 16000 feet of 336/477 ACSR Conductor, and 7500 feet of 1/0 static wire. Spearhead pre-activity meetings for all-inclusive construction process plans in collaboration with Construction Manager/General Contractor for project alignment. Engineer tracking sheet to monitor installation progress of all commodities within NICTD DT1 Project.

 

Cardinal Industrial Development is proudly certified by:

      SBA WBENC.png

 

Professional Affiliations: